Barangaroo Lobby Circulation Bridges

Entirely suspended from the ceiling slab, Normoyle have fabricated and installed two 50-tonne feature internal suspended bridges in the Barangaroo T2 lobby. Inclusive of 21.52mm clear heat strengthened laminated glass balustrades. The complex nature of this project highlights Normoyle’s ability to solve complex installation problems, develop efficient and safe install methodologies and deliver quality projects.

Normoyle was able to use the knowledge gathered from the design, fabrication and installation of the T2 bridge to complete the T3 and T1 bridges respectively, altogether adding almost 400m2 of suspended walk way to the extravagant Barangaroo International Towers’ Lobbies.

« go back to portfolio